Skip to main content

De Soto Land & Timber Access

Grant a special use permit to access private land. The existing road is .16 miles long and would be widened to 60' and surfaced to accommodate state legal maximum loads for timber harvesting and construction and operation of a commercial solar farm.

Project Summary

Last Updated: 2/11/2022