Batteast Hill Oilfield - USA#1
Proposal to drill an oil/gas well and conduct testing to see if it is commercially productive. If so, installation of production equipment, tanks, and pipelines.
Project Summary
Current Status:
Completed
Location Summary:
Approximately 7 miles NW of Gloster, MS., Off FSR 169/169C
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 04/13/2021 |
| Decision | 01/2022 (Estimated) |
| Implementation | 01/2022 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (17), 36 Cfr 220.6(E)(17)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Homochitto Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management; Minerals And Geology
Project Activity:
Special Use Authorizations; Minerals Or Geology Plans Of Operations
Project Decision Information
Batteast Hill Oilfield - USA#1
Decision Signed Date: 01/10/2022
Forests:
National Forests In Mississippi
Districts:
Homochitto Ranger District
States:
Mississippi
Counties:
Wilkinson
Legal Land Description:
T4N, R1W, Section 18
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Michael Everett
Route 1, Box 1
Meadville, MS 39653
601-384-5876
meverett@fs.fed.us
Last Updated: 1/12/2022