Tuxachanie Trail Bridge Replacement
1. Replacement of 5 footbridges on the Tuxachanie Trail in Harrison County, Mississippi. These bridges bisect several small drainages and have been destroyed by fire and flood events. Bridges are constructed of treated lumber
Project Summary
Current Status:
Completed
Location Summary:
Tuxachanie Trail, Harrison County
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 02/15/2024 |
| Decision | 03/2024 (Estimated) |
| Implementation | 05/2024 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (1), 36 Cfr 220.6(E)(1)
Special Authority:
Not Applicable / Other
Lead Management Unit:
De Soto Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Facility Management
Project Activity:
Facility Maintenance; Trail Management
Project Decision Information
Tuxachanie Trail Bridge Replacement
Decision Signed Date: 03/18/2024
Forests:
National Forests In Mississippi
Districts:
De Soto Ranger District
States:
Mississippi
Counties:
Harrison
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
James Allen
654 W. Frontage Rd.
Wiggins, MS 39577
601-584-8488
james.d.allen@usda.gov
Last Updated: 5/20/2024