Stroud Petroleum (Barlow-USA 25-3 #1, Graves-USA 25-12 #1)
Proposal to drill 2 oil/gas wells and conduct testing to see if these projects are commercially productive; installation of production equipment/tanks and a pipeline; road maintenance and timber removal from approx. 8.5 acres.
Project Summary
Location Summary:
South of US-98/US-84, approximately 2-3 miles east of Roxie, Mississippi.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 04/13/2015 |
Decision | 07/2015 (Estimated) |
Implementation | 07/2015 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (17), 36 Cfr 220.6(E)(17)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Homochitto Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Minerals And Geology
Project Activity:
Minerals Or Geology Plans Of Operations; Road Maintenance; Timber Sales (Green)
Current Status:
Completed
Project Decision Information
Decision Memos,Stroud Petroleum (Barlow-USA 25-3 #1, Graves-USA 25-12 #1)
Decision Signed Date: 07/28/2015
Forests:
National Forests In Mississippi
Districts:
Homochitto Ranger District
States:
Mississippi
Counties:
Franklin
Legal Land Description:
Section 25, of Township 6 North, Range 2 East
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Andy Hunter
Route 1, Box 1
Meadville, MS 39653
601-928-4422 Ext.26
aehunter@fs.fed.us
Last Updated: 8/19/2015