USA 6-7 #2 APD
The Bienville National Forest has received a Surface Use Plan of Operations (SUPO) request from Tellus Operating Group for APD: USA 6-7 #2. The project will involve usage of the previously constructed USA 6-7 #1 with no new surface disturbance.
Project Summary
Location Summary:
The proposal is located in Township 3 North, Range 7 East, Section 6 of Smith County, Mississippi.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 09/16/2016 |
Decision | 09/2016 (Estimated) |
Implementation | 09/2016 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.3 (3)
Special Authority:
Oil & Gas - Sec. 390, Energy Policy Act Of 2005 (Sec 390)
Lead Management Unit:
Bienville Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Minerals And Geology
Project Activity:
Minerals Or Geology Plans Of Operations
Current Status:
Completed
Project Decision Information
USA 6-7 #2 APD
Decision Signed Date: 09/16/2016
Forests:
National Forests In Mississippi
Districts:
Bienville Ranger District
States:
Mississippi
Counties:
Smith
Legal Land Description:
Township 3 North, Range 7 East, Section 6 of Smith County, Mississippi.
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Christopher Locke
3473 Hwy. 35S
Forest, MS 39074
601-469-3811
clocke@fs.fed.us
Last Updated: 9/22/2016