Range 18 Armor Moving Target System
The requested action is construction of a new Armor Moving Target system (AMTS) on Range 18. Construction will include the formation of a new berm, concrete backstop, rail bed and target moved enclosure, electrical installation and ground leveling.
Project Summary
Location Summary:
Camp Shelby Special Use Permit Area, Range 18 inside the SW corner of the Camp Shelby Impact Closure Area,
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 06/30/2017 |
Comment Period | 04/27/2018 |
Objection Period Start | 04/27/2018 |
Decision | 06/2018 (Estimated) |
Implementation | 07/2018 (Estimated) |
Expected Analysis Type:
Environmental Assessment
Special Authority:
Not Applicable / Other
Lead Management Unit:
De Soto Ranger District
Notice and Comment Regulation:
218 (2013) Non-HFRA
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Completed
Project Decision Information
Range 18 Armor Moving Target System Installation Project FONSI and DN
Decision Signed Date: 06/01/2018
Range 18 Armor Moving Target System
Decision Signed Date: 06/01/2018
Forests:
National Forests In Mississippi
Districts:
De Soto Ranger District
States:
Mississippi
Counties:
Forrest
Legal Land Description:
T1N, R11W Section 36, Forrest County, MS.
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
James Allen
654 W. Frontage Rd.
Wiggins, MS 39577
601-584-8488
davidallen@fs.fed.us
Last Updated: 6/8/2018