Hampton 3D Geophysical Project
Proposal to permit a 3D seismic line across Forest Service land, including land survey, location of drill sites and equipment routes, drilling of shot holes, loading explosives in the holes, detonating and recording, and cleanup.
Project Summary
Location Summary:
A broad area north of Eddiston and Quinton, MS, taking in approximately 4.5 square miles of USFS surface area within a 13 sqmi area.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 09/23/2020 |
Decision | 07/2021 (Estimated) |
Implementation | 08/2021 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (8), 36 Cfr 220.6(E)(8)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Homochitto Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Minerals And Geology
Project Activity:
Minerals Or Geology Plans Of Operations
Current Status:
Completed
Project Decision Information
Hampton 3D Geophysical Project
Decision Signed Date: 07/22/2021
Forests:
National Forests In Mississippi
Districts:
Homochitto Ranger District
States:
Mississippi
Counties:
Franklin
Legal Land Description:
T6N, R4E, sections 1 and 3; T7N, R4E, Sections 34 and 36; T7N, R5E, Sections 7-20 and 29-30.
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Michael Everett
Route 1, Box 1
Meadville, MS 39653
601-384-5876
meverett@fs.fed.us
Last Updated: 8/11/2021