Camp Keller Woolmarket Awnings
The Naval Construction Group TWO Woolmarket Rifle/Pistol Range requests construction of : 1. Range Shelter 1A 2. Range Shelter 1B 3. Range Shelter 2A 4. Range Shelter 2B 5. Brass Reclamation Shelter 6. PEB Pre-Engineered Metal Buildings
Project Summary
Location Summary:
Section 15, T6S, R10W
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 07/17/2023 |
Decision | 10/2023 (Estimated) |
Implementation | 09/2023 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (21), 36 Cfr 220.6(E)(21)
Special Authority:
Not Applicable / Other
Lead Management Unit:
De Soto Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Completed
Project Decision Information
Camp Keller Woolmarket Awnings
Decision Signed Date: 10/24/2023
Forests:
National Forests In Mississippi
Districts:
De Soto Ranger District
States:
Mississippi
Counties:
Harrison
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
James Allen
654 W. Frontage Rd.
Wiggins, MS 39577
601-584-8488
james.d.allen@usda.gov
Last Updated: 2/15/2024