Skip to main content

South Toe River Relocation

Relocate approximately 550 feet of the South Toe River channel away from the toe of the boulder wall by excavating a new channel in the river active channel (point bar) and floodplain using a tracked excavator. See project plans in documents.

Project Summary

Last Updated: 8/9/2018