Skip to main content

Lujenida Portage Reroute

In 2013 a beaver dam flooded 250-300' of portage including 40' of boardwalk. Erosion has occurred on multiple unsustainable paths used to avoid the flooded section. We propose to reroute about 600' of portage to higher ground.

Project Summary

Last Updated: 6/22/2015