Powwow Trail Reroute
Reroute 500' of the hiking trail that goes through a section that is often underwater due to its poor location in a natural drainage. We propose to reroute that section of trail onto durable terrain on the east side of the trail.
Project Summary
Location Summary:
T62N R8W Section 18, T62N R8W Sec 24. Project located between Powwwow trail entry point and Pose Lake.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 04/01/2015 |
Decision | 08/2015 (Estimated) |
Implementation | 10/2015 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (1), 36 Cfr 220.6(E)(1)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Tofte Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Recreation Management
Project Activity:
Trail Management
Current Status:
Cancelled
Forests:
Superior National Forest
Districts:
Tofte Ranger District
States:
Minnesota
Counties:
Lake
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Anna Botner
7355 West Hwy 61
Tofte, MN 55615
218-387-3220
annagbotner@fs.fed.us
Last Updated: 3/15/2016