Skip to main content

Projects

Wildfire Risk Reduction Project (formerly the Ecological Restoration Project)

The project is designed to restore fire-adapted ecosystems, reduce fuels, and reintroduce fire on the landscape by prescribed burning.

Note: Not all projects may appear on map. See list below for complete list of projects with more information or documentation.

SOPA Reports

The Schedule of Proposed Actions (SOPA) contains a list of proposed actions for Los Padres National Forest that will soon begin or are currently undergoing environmental analysis and documentation. It provides information so that you can become aware of and indicate your interest in specific proposals. We encourage your early and ongoing involvement in any proposals of interest to you.

Sort by:

Los Padres National Forest Projects

Carbon California is requesting to drill 8 oil and gas wells at 4 existing well pads, installation of 7,960 feet of new pipeline, a 400 barrel emergency tank, a transfer pump, three pressure vessels, and 2 master headers in the Sespe Oil Field.

Renewal of expired water system permit - Special Use Permit to include: spring diversion at Hilton Spring, waterline, 2 water storage tanks, water treatment facility and access road to tank and treatment facility.

Flood Damage Repair, Road Maintenance and Aquatic Passage Improvement.

Healthy Forest thinning project designed to improve the health and vigor of the existing stands and to make the stands more resilient to stressors such as drought, insects & wildfire.

In support of the CRMP for Piru Creek WSR, final documents are available for an objection period pursuant to Forest Service Regulations (36 CFR 218). See posted notice for background and instructions on submitting comments.

Proposal to authorize continued grazing on the Porter, Pine Canyon and South Fork La Brea Allotments.

Reroute 3.1 miles of the existing Pothole Trail from it's junction with Piru Canyon Road to the Sespe Wilderness boundary to create a more sustainable, user-friendly trailway that meets Forest Service trail standards.

Renewal of an expired SUP of a 3" oil pipeline in the Sespe oil field, with no change to the facilities or scope of operation.

This proposal aims to restore Rose Valley Creek to its historical stream function, form, and habitat to benefit native aquatic species and armor Rose Valley creek from future wildfires by bolstering the riparian zone.

Improve resource conditions and protect the Cuesta Botanical Special Interest Area on West Cuesta Ridge by providing sustainable managed recreation activities consistent with Los Padres LMP, to include designating 10 mountain bike trails.

This project will bolster campground crossing safety and provide aquatic organism passage by adding two bridges. During high flows four concrete crossings within the campground are dangerous for pedestrians and vehicles due to their smooth surfaces.

The project is designed to increase community/infrastructure protection and wildfire containment opportunities by establishing fuelbreaks, defense zones, and improve vegetation resilience and the health of forested areas from environmental stressors.

Project Archive

Some of our older projects can be accessed in our Project Archive.