Skip to main content

Lucky Strike Placer

Approve Plan of Operations as proposed or require changes or additions to minimize adverse effects. Excavate up to 4 trenches in 4 areas (16 total). Trenches reclaimed once testing completed for the site. Only 1 active trench open at a time.

Project Summary

Last Updated: 12/5/2023