Skip to main content

Siegel Creek Placer Exploration

Approve Plan of Operations as proposed or require changes or additions to minimize adverse environmental effects. Excavate trenches in one area (~2 ac). Construct crossing across Siegel Crk for access. Recirc water from 2 sumps. Camp at project site.

Project Summary

Last Updated: 8/3/2021