Skip to main content

Stickley Suction Dredging

Approve Plan of Operations as proposed or require changes or additions to minimize adverse environmental effects. One section up to 400ft L to be sampled in the Red River using a 5 in. suction dredge with a 4 in. intake. Reclamation done concurrently

Project Summary

Last Updated: 10/24/2024