Skip to main content

Musselshell Creek Restoration: Beaver Dam Analogs Phase 3

Installation of up to 24 beaver dam analogs and post assisted log structures along 1.5 miles stretch. Use local vegetation hydraulic post drives. Intent to mimic natural conditions created by beaver dams, raise water table, meadow recovery.

Project Summary

Last Updated: 11/17/2023