Skip to main content

O'hara Bridge 651-01 Replacement

Replace existing 74 foot two-span bridge with 134 foot channel spanning bulb-tee bridge designed to handle 100 year flows. Current bridge has increased risk of failure and impedes movement of large debris.

Project Summary

Last Updated: 3/22/2024