Washington Creek Culvert Replacement

FSR 246 crosses Washington Creek at two sites; each having 3-5 undersized culverts at risk of failure. The culverts at each site would be removed and replaced with a bridge designed to pass the 100 year flow. It will take approx. 6 weeks to complete.