Skip to main content

Waterline Placer Exploration

Excavate existing placer gravels/tailings in a previously mined area. Material processed onsite; water taken from an existing 180-foot x 160-foot impoundment. Construct 5 settling ponds for process water/waste material. Personnel to camp onsite.

Project Summary

Last Updated: 9/28/2021