Skip to main content

GAOA Crazy Woman Road (NFSR 33) Phase II Repairs

Construct a new bridge at mile post 1.7 on Crazy Woman Road (NFSR #33). Replace culvert with bridge at mile post 4.52. Construct gabion retaining walls between mile 4.52 and 4.9 in 3 narrow areas to provide slope stability.

Project Summary

Last Updated: 8/23/2024