Skip to main content

Southern Black Hills Water System Supplemental EA

The project is proposing to modify the original decision pertaining to the waterflow intake and water source as documented in the Decision Notice signed in 2012. The proposed action would allow for increased waterflow through the existing pipeline.

Project Summary

Last Updated: 2/23/2023