Range Telephone Cooperative Maintenance and Installation
Maintenance and installation of fiber optic cable under existing special use permit. New installation lines will be amended to the existing permit.
Project Summary
Current Status:
Completed
Location Summary:
New installation line is located within the road right-of-way corridor on Elk Ridge Road. Existing line replacement is located within the road right-of-way corridor on Miller Creek Road.
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 04/05/2018 |
| Decision | 07/2018 (Estimated) |
| Implementation | 08/2018 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (2), 36 Cfr 220.6(E)(2)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Bearlodge Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Project Decision Information
Range Telephone Cooperative Maintenance and Installation
Decision Signed Date: 07/05/2018
Forests:
Black Hills National Forest
Districts:
Bearlodge Ranger District
States:
Wyoming
Counties:
Crook
Legal Land Description:
T51N R63W Section 9 SW 1/4 NW 1/4, T51N R64W Section 1 NE 1/4 SW 1/4
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Dona Warwick
101 S. 21st Street
Sundance, WY 82729
307-283-1361
dwarwick@fs.fed.us
Last Updated: 12/10/2019