Skip to main content

Deadwood-Agnew Mine Reclamation Project

The area to be reclaimed is approximately 4.4 acres. The mines open pit will be filled with a mica reclamation product that is produced at Pacer Corp. Once the pit is filled topsoil will be applied and the area will be seeded.

Project Summary

Last Updated: 6/26/2015