Skip to main content

BHEC, Inc. Amendment to CEM14 Special Use Permit

Replace existing single phase overhead power line with three phase overhead power line (7.2/14.4kV); replace existing power poles (35' class 5&6) with 35' (class 3&4).

Project Summary

Last Updated: 7/19/2017