Road use NFSR 925, 925A, and 930 (Keeline Road) and non-system road
Project entry 61300 was canceled because a duplicate entry was made on the Schedule of Proposed Actions. Refer to project no. 63030 which is the same proposed action.
Project Summary
Location Summary:
Thunder Basin NG.
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 10/2022 (Estimated) |
| Decision | 10/2022 (Estimated) |
| Implementation | 10/2022 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Douglas and Thunder Basin Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations; Road Maintenance; Road Improvements/Construction
Current Status:
Cancelled
Forests:
Medicine Bow-Routt National Forest
Districts:
Douglas and Thunder Basin Ranger District
States:
Wyoming
Counties:
Campbell; Weston
Legal Land Description:
T43N R68W, T43N R69W, T44N R68W, T44N R69W.
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Robena Downie
2250 East Richards Street
Douglas, WY 82633-8922
307-358-4690
Robena.Downie@usda.gov
Last Updated: 10/28/2022