Mackey Road Geotechnical Soil/sediment Sampling
The Forest Service is proposing to authorize Peabody Powder River Mining, LLC (PPRM) to conduct geotechnical boring on National Forest System (NFS) lands to explore subsurface soil and sediment properties.
Project Summary
Location Summary:
Starts approximately 15 miles east of the HWY 59 and HWY 450 Junction.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 12/01/2011 |
Comment Period | 12/01/2011 |
Decision | 12/2011 (Estimated) |
Implementation | 12/2011 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Forest Service Energy Implementation Plan
Lead Management Unit:
Douglas and Thunder Basin Ranger District
Notice and Comment Regulation:
215
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Completed
Project Decision Information
Mackey Road Geotechnical Drilling Decision Memo
Decision Signed Date: 12/14/2011
Forests:
Medicine Bow-Routt National Forest
Districts:
Douglas and Thunder Basin Ranger District
States:
Wyoming
Counties:
Campbell
Legal Land Description:
30-31, T. 43 N., R. 69 W. and Sections 6-8, 17, 21-22, T. 42 N., R. 69 W., 6th P.M.
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Peter Rose
2250 East Richards Street
Douglas, WY 82633-8922
307-358-4690
pjrose@fs.fed.us
Last Updated: 12/19/2011