Skip to main content

Lester Creek (Pearl Lake) Dam Repair

CO Dept of Parks & Wildlife proposal for the installation of 200 LF of toe drain pipe, 45 tons of riprap bedding and 130 tons of riprap, to increase the stability of the right abutment and dewater the left abutment.

Project Summary

Last Updated: 7/30/2012