Powder River Energy Corporation (PRECorp) 69kV Powerline for DCP Midstream LLC
Construction of new overhead 69kV powerline (5-wire; single, treated wood poles), originating from PRECorp Tekla substation and crossing 4,935 feet Federal lands, providing service for DCP Midstream to a natural gas pump station off federal land.
Project Summary
Location Summary:
Project is corridored along Matheson Road and Basin Electric 230 Kv powerline in Campbell County, WY.
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 07/2015 (Estimated) |
| Comment Period | 08/2015 (Estimated) |
| Objection Period Start | 11/2015 (Estimated) |
| Decision | 01/2016 (Estimated) |
| Implementation | 01/2016 (Estimated) |
Expected Analysis Type:
Environmental Assessment
Special Authority:
Not Applicable / Other
Lead Management Unit:
Douglas and Thunder Basin Ranger District
Notice and Comment Regulation:
218 (2013) Non-HFRA
Project Purpose:
Special Use Management
Project Activity:
Electric Transmission; Special Use Authorizations
Current Status:
Cancelled
Forests:
Medicine Bow-Routt National Forest
Districts:
Douglas and Thunder Basin Ranger District
States:
Wyoming
Counties:
Campbell
Legal Land Description:
SNE, NWNE, NNW of Sec 3, T41N R71W
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Hillary Shirley
2250 East Richards Street
Douglas, WY 82633-8922
307-358-7115
hillarykshirley@fs.fed.us
Last Updated: 6/30/2015