Butte Pipeline Co. Rocky Point Road Crossing Pipeline Repair
Replacement of existing crude oil pipeline using horizontal directional drilling under Rocky Point Road, to include staging area, drilling rig landing area, and bell holes (pits) on both sides of the road. Was misnamed Belle Fourche Pipeline Co.
Project Summary
Location Summary:
Rocky Point Road (Campbell County Road 85); south of Gilette, WY on the Thunder Basin National Grassland-Spring Creek Unit.
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 09/22/2015 |
| Decision | 11/2015 (Estimated) |
| Implementation | 11/2015 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.12 (8), 36 Cfr 220.6(D)(8)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Medicine Bow-Routt National Forest All Units
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management; Minerals And Geology
Project Activity:
Special Use Authorizations; Oil
Current Status:
Completed
Project Decision Information
Butte Pipeline Co. Rocky Point Road Crossing Pipeline Repair
Decision Signed Date: 11/24/2015
Forests:
Medicine Bow-Routt National Forest
Districts:
Douglas and Thunder Basin Ranger District
States:
Wyoming
Counties:
Campbell
Legal Land Description:
NWNW Sec 7 T54N R70W
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Hillary Shirley
2468 Jackson Street
Laramie, WY 82070
307-358-7115
hillarykshirley@fs.fed.us
Last Updated: 12/18/2015