Battle Ditch Repair and Restoration
The proposed action is to install a headgate, measuring flow box, 991 feet of 24 inch diameter pipe along the existing right-of-way, and instream structures in Battle Creek. Project has been cancelled. See Project #54006.
Project Summary
Location Summary:
T13N, R87W, Section 30, SE1/4 SW1/4
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 03/06/2018 |
Decision | 07/2018 (Estimated) |
Implementation | 07/2018 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3); 32.2 (18), 36 Cfr 220.6(E)(18)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Brush Creek/Hayden Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Wildlife, Fish, Rare Plants; Special Use Management; Watershed Management
Project Activity:
Species Habitat Improvements; Special Use Authorizations; Watershed Improvements
Current Status:
Cancelled
Forests:
Medicine Bow-Routt National Forest
Districts:
Brush Creek/Hayden Ranger District
States:
Wyoming
Counties:
Carbon
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
William Baer
2171 South Highway 130,
Saratoga, WY 82331
307-326-2538
wbaer@fs.fed.us
Last Updated: 10/25/2018