Dewatering Pipeline Installation at North Antelope Rochelle Mine
Installation of a surface water pipeline in a right-of-way and amendment of an existing authorization. Proponent is Peabody Powder River Mining, LLC.
Project Summary
Location Summary:
15 miles southeast of Wright, WY. Campbell County Road 4 (Antelope Road) provides access. Thunder Basin NG.
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 03/24/2020 |
| Decision | 06/2020 (Estimated) |
| Implementation | 06/2020 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Douglas and Thunder Basin Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management; Minerals And Geology
Project Activity:
Special Use Authorizations; Minerals Or Geology Plans Of Operations
Current Status:
Completed
Project Decision Information
Dewatering Pipeline Installation at North Antelope Rochelle Mine
Decision Signed Date: 06/03/2020
Forests:
Medicine Bow-Routt National Forest
Districts:
Douglas and Thunder Basin Ranger District
States:
Wyoming
Counties:
Campbell
Legal Land Description:
S2 S2 Section 34, T42N, R71W, 6th Principal Meridian
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
James McKay
2250 East Richards Street
Douglas, WY 82633-8922
307-358-4690
james.mckay@usda.gov
Last Updated: 6/3/2020