Skip to main content

Removal of Trespass Pipeline

Authorization of a right-of-way and reclamation activities to remove a recently installed crude oil pipeline that was not in operation. The pipeline was initially misaligned onto a parcel of the national grassland.

Project Summary

Last Updated: 1/22/2024