Special Use Authorization - Pipeline Right-of-Way - EOG Resources
Right-of-way with oil and gas and water pipelines and buried electric power line installation.
Project Summary
Location Summary:
Thunder Basin NG, vicinity of Antelope Flat.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 06/09/2023 |
Decision | 07/2023 (Estimated) |
Implementation | 07/2023 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Douglas and Thunder Basin Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Minerals And Geology; Special Use Management
Project Activity:
Electric Transmission; Special Use Authorizations; Minerals Or Geology Plans Of Operations; Natural Gas; Oil
Current Status:
Completed
Project Decision Information
Special Use Authorization Pipeline Utility Right-of-Way EOG Resources
Decision Signed Date: 07/18/2023
Forests:
Medicine Bow-Routt National Forest
Districts:
Douglas and Thunder Basin Ranger District
States:
Wyoming
Counties:
Campbell
Legal Land Description:
Sec. 20, 21 T41N R72W
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Robena Downie
2250 East Richards Street
Douglas, WY 82633-8922
307-358-4690
Robena.Downie@usda.gov
Last Updated: 7/19/2023