Sawmill Gulch Non system route closure
Use heavy equipment to rip, seed and establish erosion control features to reduce sedimentation and erosion issues along non-system routes. Boulders, slash and green trees would be placed to limit access.
Project Summary
Location Summary:
Approximately 9 miles south of Leadville, in the Sawmill Gulch area.
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 07/23/2015 |
| Decision | 08/2015 (Estimated) |
| Implementation | 08/2015 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (20), 36 Cfr 220.6(E)(20)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Leadville Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Road Management
Project Activity:
Travel Management
Current Status:
Completed
Project Decision Information
Sawmill Gulch Nonsystem Route Closure
Decision Signed Date: 08/10/2015
Forests:
Pike and San Isabel National Forests and Cimarron and Comanche National Grasslands
Districts:
Leadville Ranger District
States:
Colorado
Counties:
Lake
Legal Land Description:
T10S, R79W, Sec 31; T10S, R80W, Sec 35 and 36; T11S, R80W, Sec 1
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Lisa Corbin
810 Front Street
Leadville, CO 80461
719-486-7447
lcorbin@fs.fed.us
Last Updated: 8/10/2015