Skip to main content

Rainbow Trail Reroute

A portion of the Rainbow Trail was damaged by flooding & erosion caused by post-Hayden Pass Fire conditions. The FS proposes to reroute 2.5 miles of trail between Rattlesnake & Battle Mountain within the Pole Gulch drainage.

Project Summary

Last Updated: 1/4/2021