Skip to main content

Kile Mine Plan of Operations

The operator proposes to hand tools to excavate prospect pits of 2 feet x 3 feet x 2 feet that will remain open for a maximum of 3 days over 5 years. The mining operations use two non-system access routes, 8ft x 1400ft cumulatively.

Project Summary

Last Updated: 8/10/2020