Breckenridge Stables Facility Upgrades
Breckenridge Stables proposes the replacement of temporary mobile buildings with a permanent operations building and a permanent guest services building. Water and power utilities are planned to provide indoor toilets and options for food services.
Project Summary
Location Summary:
Breckenridge Stables is located on Peak 9 within the Breckenridge Ski Resort special use permit area.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 01/17/2025 |
Comment Period | 01/17/2025 |
Decision | 06/2025 (Estimated) |
Implementation | 07/2025 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (22), 36 Cfr 220.6(E)(22)
Special Authority:
Not Applicable / Other
Lead Management Unit:
East Zone/Dillon Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Recreation Management; Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Completed
Project Decision Information
Breckenridge Stables Facility Upgrades
Decision Signed Date: 06/11/2025
Forests:
White River National Forest
Districts:
East Zone/Dillon Ranger District
States:
Colorado
Counties:
Summit
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Sarah Strehle
680 Blue River Parkway
Silverthorne, CO 80498
970 401 0863
sarah.strehle@usda.gov
Last Updated: 6/23/2025