VANE Minerals Uranium Exploration Drilling Project
VANE Minerals proposes to drill exploration holes for uranium at a total of 7 sites within the Tusayan Ranger District. All drilling will be strictly limited to exploration holes, and no actual mining of ore will occur.
Project Summary
Location Summary:
Sites are east of Highway 64/180 in the Red Butte and Upper Basin areas of the Tusayan RD
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 03/14/2007 |
| Decision | 12/2007 (Estimated) |
| Implementation | 01/2008 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (8), 36 Cfr 220.6(E)(8)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Tusayan Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Minerals And Geology
Project Activity:
Minerals Or Geology Plans Of Operations
Current Status:
Completed
Project Decision Information
VANE Minerals Uranium Exploration Drilling Project
Decision Signed Date: 12/20/2007
Forests:
Kaibab National Forest
Districts:
Tusayan Ranger District
States:
Arizona
Counties:
Coconino
Legal Land Description:
Various throughout Tusayan Ranger District (map available)
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Barbara McCurry
176 Lincoln Log Loop
Grand Canyon, AZ 86023
928-635-8220
bmccurry@fs.fed.us
Last Updated: 6/16/2015