Skip to main content

Rainbow Rim Extension

The NKRD proposes to extend the existing Rainbow Rim trail east 8 miles. The first 4.5 miles will be new extension, and the remaining 3.5 mile will follow an existing decommisioned roadbed. The minimum tread wide of the new path will be 18-inches.

Project Summary

Last Updated: 12/10/2019