GC Hub Wireless Communications Site Development
Construct a communications facility as part of a wireless communication system to serve the Grand Canyon area. Includes: 125 foot tall tower; Prebuilt equipment building; Solar hybrid power system; 100 x 100 ft compound with a 6 ft fence.
Project Summary
Location Summary:
The proposed site is located on Skinner Ridge off of FR 343 and FR 343F. Just to the south of the range fence line.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 03/14/2013 |
Decision | 09/2014 (Estimated) |
Implementation | 10/2014 (Estimated) |
Expected Analysis Type:
Decision Memo
Lead Management Unit:
Kaibab National Forest All Units
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Cancelled
Forests:
Kaibab National Forest
Districts:
Tusayan Ranger District
States:
Arizona
Counties:
Coconino
Legal Land Description:
NW1/4, SW1/4 of Section 7, T 29 N, R 4 E.
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Liz Schuppert
800 South Sixth Street
Williams, AZ 86046
928-635-8367
lschuppert@fs.fed.us
Last Updated: 10/22/2014