Miller Pasture Water Pipeline Extension
Extend pipeline from Power Line Storage Tank (#001920) in Miller Pasture to Fix Tank located in the NW corner of the pasture. New pipeline would be about 1.5 miles long length, constructed of 1.5" diam. HDPE poly-pipe buried 30" deep.
Project Summary
Location Summary:
T 25N, R 3E, Sections 1 and 12
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 02/15/2017 |
Comment Period | 05/03/2017 |
Objection Period Start | 06/14/2017 |
Decision | 08/2017 (Estimated) |
Implementation | 08/2017 (Estimated) |
Expected Analysis Type:
Environmental Assessment
Special Authority:
Not Applicable / Other
Lead Management Unit:
Williams Ranger District
Notice and Comment Regulation:
218 (2013) Non-HFRA
Project Purpose:
Grazing Management
Project Activity:
Grazing Structural Improvements
Current Status:
Completed
Project Decision Information
Miller Pasture Water Pipeline Extension
Decision Signed Date: 08/07/2017
Forests:
Kaibab National Forest
Districts:
Williams Ranger District
States:
Arizona
Counties:
Coconino
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Cherie Owens
742 S. Clover Road
Williams, AZ 86046
928-635-5621
cowens02@fs.fed.us
Last Updated: 8/15/2017