Grandview Lookout Cabin Adaptive Reuse to Cabin Rental
Work to prepare Grandview Lookout Cabin for use as a cabin rental. Activities include roof and paint hazmat abatement, solar panel installation, a new gravel path to the existing vault toilet, greywater system installation, and other upgrades.
Project Summary
Location Summary:
Adjacent to Grandview Lookout Tower off of Forest Road 310
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 09/01/2021 |
Decision | 07/2022 (Estimated) |
Implementation | 09/2022 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.12 (5), 36 Cfr 220.6(D)(5)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Tusayan Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Recreation Management; Facility Management
Project Activity:
Developed Site Management; Facility Improvements/Construction; Facility Maintenance
Current Status:
Completed
Project Decision Information
Categorical Exclusion Without Written Decision
Decision Decided Date: 07/08/2022
Forests:
Kaibab National Forest
Districts:
Tusayan Ranger District
States:
Arizona
Counties:
Coconino
Legal Land Description:
T30N, R4E, Section 27, Gila and Salt River Meridian
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Jeremy Haines
176 Lincoln Log Loop
Grand Canyon, AZ 86023
928-635-8367
jeremy.haines@usda.gov
Last Updated: 7/8/2022