USGS Pinyon Plain Mine Water Runoff Monitoring Stations Permit Amendment
Amend U.S. Geological Survey's existing special use permit to allow for installation of additional equipment to monitor surface runoff upslope and downslope of the Pinyon Plain Mine.
Project Summary
Location Summary:
Upslope and downslope of the Pinyon Plain Mine, approximately 6 miles SE of the Town of Tusayan.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 11/17/2021 |
Decision | 02/2022 (Estimated) |
Implementation | 03/2022 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Tusayan Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Research
Project Activity:
Special Use Authorizations; Research And Development
Current Status:
Completed
Project Decision Information
USGS Pinyon Plain Mine Water Runoff Monitoring Stations Permit Amendment
Decision Signed Date: 02/16/2022
Forests:
Kaibab National Forest
Districts:
Tusayan Ranger District
States:
Arizona
Counties:
Coconino
Legal Land Description:
T29N, R3E, Section 20, Gila and Salt River Meridian
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Chelsea Muise
176 Lincoln Log Loop
Grand Canyon, AZ 86023
928-635-8275
chelsea.muise@usda.gov
Last Updated: 2/17/2022