Babbitt Ranch Energy Center Interconnection Project

Authorize installation of approximately 9 miles of above-ground fiber optic line on FS land within an existing APS right-of-way needed to provide emergency communications for the Babbitt Ranch Energy Center. Bureau of Reclamation is leading the NEPA.

Project Summary

Last Updated: 3/29/2023