El Paso Natural Gas Cathodic Protection Station and Right Of Way Modification

Cathodic protection stations are needed in three locations along the El Paso Natural Gas Line outside of the existing Right-of-Way. Installation involves drilling a 10-inch bore 500-600 feet into the ground to place anodes and metallic rods.