Torrey Town Springs Development
To ensure that the town of Torrey continue to supply its residences with water the Fishlake NF is proposing to develop four spring complexes with eight spring collection areas. Pipeline would then be installed to connect to existing water lines.
Project Summary
Current Status:
Completed
Location Summary:
The proposed project is located north of Torrey near Chaffin Springs in Wayne County, Utah. The project area is located in portions of Sections 3, 9, and 10; Township 28S; Range 4E.
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 01/23/2020 |
| Comment Period | 01/23/2020 |
| Objection Period Start | 05/21/2020 |
| Decision | 07/2020 (Estimated) |
| Implementation | 08/2020 (Estimated) |
Expected Analysis Type:
Environmental Assessment
Special Authority:
Not Applicable / Other
Lead Management Unit:
Fremont River Ranger District
Notice and Comment Regulation:
218 (2013) Non-HFRA
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Project Decision Information
Torrey Town Springs Development
Decision Signed Date: 07/22/2020
Forests:
Fishlake National Forest
Districts:
Fremont River Ranger District
States:
Utah
Counties:
Wayne
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Jenneka Knight
138 South Main Street
Loa, UT 84747
435-896-1083
jknight@fs.fed.us
Last Updated: 7/22/2020