Bel Mia Girls Home and Maple Springs Campground Sewer Line
Proposed project would issue an SUP to construct a 4,000 ft pipeline connection to the existing waste water collection system at the FS Box Elder Campground, connecting to the wastewater collection and treatment system operated by Brigham City
Project Summary
Location Summary:
Near Mantua, 4 miles east of Brigham City, Utah
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 10/30/2007 |
Decision | 09/2008 (Estimated) |
Implementation | 10/2008 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Logan Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Recreation Management
Project Activity:
Developed Site Management
Current Status:
Completed
Project Decision Information
Bel Mia Girl'sHome and Maple Springs Campground Sewer Line
Decision Signed Date: 09/22/2008
Forests:
Uinta-Wasatch-Cache National Forest
Districts:
Logan Ranger District
States:
Utah
Counties:
Box Elder
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Evelyn Sibbernsen
1500 East Highway 89
Logan, UT 84321
435-755-3620
esibbernsen@fs.fed.us
Last Updated: 9/23/2008