Skip to main content

Water Transmission Line Replacement for Silver Lake Estates #1

Brighton Properties/Silver Lake Estates #1 subdivision is proposing toreplace an existing 2 inch dia. galvanized steel water transmission line that supplies water from an existing spring box, to their 150,000 gal buried concrete storage tank.

Project Summary

Last Updated: 12/12/2008