Snowbasin Gondola Tower and School Hill Connector Run
Proposal includes two projects at Snowbasin Ski Area: 1) installation of an additional tower between two existing towers on the Needles Gondola; and 2) clearing of trees and slope grading on a short connector trail between School Hill and Becker Face
Project Summary
Location Summary:
Snowbasin Ski Area
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 07/01/2010 |
Decision | 08/2010 (Estimated) |
Implementation | 10/2010 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Ogden Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Completed
Project Decision Information
Snowbasin Gondola tower and School Hill Connector Run
Decision Signed Date: 08/02/2010
Forests:
Uinta-Wasatch-Cache National Forest
Districts:
Ogden Ranger District
States:
Utah
Counties:
Weber
Legal Land Description:
T6N, R1E, Section 32
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Rick Vallejos
507 25th Street
Ogden, UT 84401
801-625-5112
rvallejos@fs.fed.us
Last Updated: 9/29/2010