Streambank Stabilization at Pine Bluff Bridge
Proposal would place large rocks along the existing rock reinforcement structure to further stabilize the deteriorating streambank. Rocks will be placed during low water among existing rock and vegetation.
Project Summary
Location Summary:
Logan River at the Pine Bluff Bridge
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 10/20/2010 |
Decision | 03/2011 (Estimated) |
Implementation | 08/2011 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (7), 36 Cfr 220.6(E)(7)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Logan Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Wildlife, Fish, Rare Plants
Project Activity:
Species Habitat Improvements
Current Status:
Completed
Project Decision Information
Pine Bluff Bank Stabilization
Decision Signed Date: 03/21/2011
Forests:
Uinta-Wasatch-Cache National Forest
Districts:
Logan Ranger District
States:
Utah
Counties:
Cache
Legal Land Description:
Section 24, T12N, R2E, SL B&M
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Kelli Taylor
1500 East Highway 89
Logan, UT 84321
435-755-3626
ktaylor02@fs.fed.us
Last Updated: 3/21/2011